Andrade Gutierrez, a contractor working on a Algeria drainage tunnel project, successfully constructed a 1,100-meter drainage tunnel system to combat urban flooding.
Facing challenges with traditional excavation methods in sensitive limestone terrain near the city, they adopted the innovative Drill & Split method using a Yamamoto YTB-1120 arm system and HRB-1000 splitter mounted on a modified CAT excavator. This hydraulic rock splitting technique achieved 10.5 meters of progress per week – more than double the productivity of conventional hydraulic rock breakers – while avoiding the complications of explosives in an urban environment.
The project demonstrates how specialized equipment selection can overcome geological and regulatory constraints in challenging infrastructure projects.